PORTFOLIO Wigginton, Herts Paragraph 79 project3,000 sqft Demo and new buildKFM designRewilded site with ponds and swales40kw solar PV arrayOff-grid with batteriesAir Source Heat pumpSedum roof with copper soffit, facia and copingNatural cork and clay wallsDe-centralised MVHR (Mechanical ventilation and heat recovery)CLT and Glulam constructionWildlife habitats built into external walls Berkhamsted, Herts Berkhamsted Citizens association- Environmental project of the yearChange of use- Commercial to residential6,000 sqft luxury homeRestorationExtensionRenovationAPM Design & BuildInterior design by BibaaPrime Location Ashridge, Herts CURRENTLY UNDER CONSTRUCTION14,000 sqft Demo & New BuildTW2 Architect DesignZero CarbonConcrete and ICF constructionIndoor pool5,000 sq ft basementSuper airtightMVHR (Mechanical ventilation & Heat Recovery)50 Kw Solar PV arrayOpen loop ground source heat pump system Bicester Road, Long Crendon 5700 sqft Demo & New buildOutdoor poolASHP (Air Source Heat Pump)APM Design & BuildInterior Design by Bibaa InteriorsMVHR (Mechanical Ventilation & Heat recovery) Little Gaddesden, Herts APM Design & Build Restoration Renovation Full utilities upgrade inc upgrading to 3-phase power for car super chargers Landscaping Design by Nailormade ASHP (Air Source Heat Pump) Under floor heating Berkhamsted, Herts CURRENTLY UNDER CONSTRUCTION5,500 sqft New BuildGerman pre-fabricated concrete superstructureK-F-M Architect designLarge basementAir Source Heat Pumps Ashridge, Herts 4,000 sqft demolition & new buildDesign & build pre-fabricated timber frame with an air-tightness of 0.8 and a U-value of 0.13 W/m2k.Click images to enlargeShortlisted for the 2019 Chiltern Design AwardsInterior design by BIBAA Interiors Norfolk Broads Recently completed water front project on the Norfolk Broads.Refurb and alterations internally.Extended and refurbished anne cottage.New build double garage.New hard and soft landscaping throughout.Interior design by BIBAA interiors Tring, Herts 3,000sqft demolition & new build with large basement.Timber frame and ICF (insulated concrete form work) with Air source heat pumps.Super efficient.Glass, mirrors and shower screens supplied by Berko Glass Edgware, Middlesex 4,000sqft demolition & new build.Design & build CFSH (Code for Sustainable Homes) level 5 zero carbon. 98% of waste from construction and demolition diverted from landfill.ICF (insulated concrete formwork) construction.Super airtight with MVHR (mechanical ventilation and heat recovery).Rain water harvesting with grey water recycled and used in toilet flushing and washing machine (additional filtration required). Near Kendal, Lake District 17,000sqft demolition & new build. CFSH code level 6 zero carbon home. Achieved an innovation with the CCS (Considerate Constructors Scheme).Pool with moving floor.Dredged lake to increase depth for boating.Geothermal, air source and wood chip boiler.ICF construction St John's Wood, London 5,000 sqft high end refurbishment. Extension and basement dig out.Hard and soft landscaping. Central, London 5,000 sqft high end refurbishment for a member of the Saudi Royal family. Quebec, Canada Over $200million worth of custom homes built between 2008 and 2018.contact us for more information on overseas projects.